- Title:
- Research on multi-objective trade-off of construction engineering project under the background of "Dual Carbon"
- Author:
Tingting Song
- Author Affiliation:
College of Humanities,Shanghai Institute of Technology, Shanghai, China
- Received:Dec. 30, 2022
- Accepted:Jan. 30, 2023
- Published:Feb. 6, 2023
Discrete time-cost-environment impact trade-offs problem, engineering management, multi-mode, environment protection
[1] Hua QIuhong. Research status and development trend of Environmental accounting information disclosure in China under the background of "double carbon" -- Visual analysis based on CiteSpace [J].An accountant registered in China, 2022 (4) : 47-53.
[2] China Building Energy Conservation Association, Chongqing University. China building Energy Consumption and Carbon Emission research Report of 2021: Provincial Building carbon peak Situation Assessment [R].2021
[3] Feng K, Lu W, Chen S, et al. An integrated environment–cost–time optimisation method for construction contractors considering global warming[J]. Sustainability, 2018, 10(11): 4207.
[4] Cheng M Y, Tran D H. Opposition-based multiple-objective differential evolution to solve the time–cost–environment impact trade-off problem in construction projects[J]. Journal of Computing in Civil Engineering, 2015, 29(5): 04014074.
[5] Zheng H, Zhong L. Discrete time-cost-environment trade-off problem and its application to a large-scale construction project[C]//Proceedings of the Tenth International Conference on Management Science and Engineering Management. Springer, Singapore, 2017: 1375-1382.
[6] Lotfi R, Yadegari Z, Hosseini S H, et al. A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project[J]. Journal of industrial & management optimization, 2022, 18(1): 375.
[7] Banihashemi S A, Khalilzadeh M, Antucheviciene J, et al. Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach[J]. Buildings, 2021
[8] Banihashemi S A, Khalilzadeh M. Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach[J]. Engineering, Construction and Architectural Management, 2020.